Skip to main content

Highland High Open House

A modern building with many windows is illuminated at dusk.

Highland High School Rebuild

We are grateful to our architects, Naylor, Wentworth, and Lund, for providing these initial images, and we are excited to share them with you.

  • Video – This video highlights the overall progression of construction, showing how the new school will be built around the existing structure, and includes a fly-through of the new building.
  • Floor Plans – The school features three main levels. Because of the natural slope of the site, the gymnasium will be located on a lower sub-floor.
  • Renderings – These renderings illustrate the proposed design and structure of the new school from multiple perspectives.
  • Sustainability – These images highlight sustainability features that will be integrated into the new Highland High.
  • Flexibility – Plans emphasize adaptable spaces, such as moveable seating in the gym and theater.
  • Timeline – While timing may change, the initial timeline reflects our current projections for project completion.

Please click on any image to view a larger version.