Highland High Open House
We are grateful to our architects, Naylor, Wentworth, and Lund, for providing these initial images, and we are excited to share them with you.
- Video – This video highlights the overall progression of construction, showing how the new school will be built around the existing structure, and includes a fly-through of the new building.
- Floor Plans – The school features three main levels. Because of the natural slope of the site, the gymnasium will be located on a lower sub-floor.
- Renderings – These renderings illustrate the proposed design and structure of the new school from multiple perspectives.
- Sustainability – These images highlight sustainability features that will be integrated into the new Highland High.
- Flexibility – Plans emphasize adaptable spaces, such as moveable seating in the gym and theater.
- Timeline – While timing may change, the initial timeline reflects our current projections for project completion.
Please click on any image to view a larger version.